Joined: Apr 2005
Posts: 8881
Road Construction update
9/15/2010 at 7:07 PM
For those who haven't been down 1st st and 18th recently.
Looks like 1st is in the final stages. Sod being put down, line being painted, turning lanes open. There's also a traffic camera above the traffic signal on Kirkcaldy pointed east. It looks nice.
Traffic is flowing on both bridges, though just one lane. The centre curbs are being put in, then I would imagine soil and sod.
There's also a traffic camera at 34th and Vic pointing east.