http://www.mhs.mb.ca/docs/features/brandonrailways/index.shtml
1919
The federal government was appointed Receiver of the Grand Trunk Pacific in March 1919. It was put under the management of the CNR in 1920. It and its parent company, the Grand Trunk Railway, were formally integrated into the CNR in 1923.
The partly-built Grand Trunk Pacific spur line from Justice to Brandon was scrapped after 22 miles of roadbed had been completed. (Two large concrete bridge abutments remain today along the route.)